This page (revision-5) was last changed on 07-Mar-2022 14:41 by Peter Young

This page was created on 13-Aug-2019 23:07 by unknown

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
5 07-Mar-2022 14:41 4 KB Peter Young to previous Added bakeout section
4 13-Aug-2019 23:37 3 KB Peter Young to previous | to last
3 13-Aug-2019 23:30 3 KB Peter Young to previous | to last
2 13-Aug-2019 23:26 3 KB Peter Young to previous | to last
1 13-Aug-2019 23:07 3 KB unknown to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 20 added 6 lines
!!Less frequent planning (Mar 2008, Dec 2014)
A consequence of the X-band failure is that Hinode planning switched from daily (Mon-Sat, with Sunday off) to three times a week (uploads on Tue, Thu & Sat). This impacted the ability to observe transient events, particularly flares.
In an effort to cut operations costs, "focused mode" operations began in December 2014. For these an entire 7-day plan is loaded on Saturdays. This only occurs during the Hinode and IRIS eclipse seasons (approx April-August and Oct-Feb, respectively), and only for selected weeks.