This page (revision-7) was last changed on 07-Dec-2016 14:14 by David R Williams

This page was created on 16-May-2007 13:04 by David R Williams

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
7 07-Dec-2016 14:14 3 KB David R Williams to previous
6 11-May-2010 12:39 3 KB David R Williams to previous | to last
5 16-Mar-2010 15:38 3 KB PeterYoung to previous | to last
4 19-May-2009 11:31 2 KB David R Williams to previous | to last
3 16-May-2007 13:14 2 KB David R Williams to previous | to last
2 16-May-2007 13:12 2 KB David R Williams to previous | to last
1 16-May-2007 13:04 1 KB David R Williams to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 added 2 lines
[{ALLOW edit EISMainUsers}]
[{ALLOW view Anonymous}]
At line 21 changed one line
The eclipses have their maximum duration around 20 June each year. The EIS CO is provided with the times for "XRT twilight" each orbit and, for 20 June 2009, the duration of XRT twilight was 30 minutes. The guideline for EIS COs is to begin the EIS plan 2 minutes after exiting XRT twilight.
The eclipses have their maximum duration around 20 June each year. The EIS CO is provided with the times for "X-ray twilight" each orbit and, for 20 June 2009, the duration of XRT twilight was 30 minutes. The guideline for EIS COs is to schedule the next observation no less than 2 minutes after exiting XRT twilight. (N.B. This is now factored into the planning tool buffers which allow observing windows to be calculated).