This page (revision-7) was last changed on 07-Dec-2016 14:14 by Peter Young

This page was created on 01-Feb-2013 21:34 by Peter Young

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
7 07-Dec-2016 14:14 7 KB Peter Young to previous
6 02-May-2013 21:40 7 KB Peter Young to previous | to last
5 23-Apr-2013 08:15 6 KB Louise Harra to previous | to last
4 01-Feb-2013 22:16 5 KB Peter Young to previous | to last
3 01-Feb-2013 22:15 5 KB Peter Young to previous | to last
2 01-Feb-2013 21:38 5 KB Peter Young to previous | to last
1 01-Feb-2013 21:34 5 KB Peter Young to last

Page References

Incoming links Outgoing links
IRIS30day...nobody

Version management

Difference between version and

At line 1 added 2 lines
[{ALLOW edit EISMainUsers}]
[{ALLOW view Anonymous}]
At line 7 added 2 lines
Please check the two documents available from the 'Attach' tab (see above).
At line 13 added 2 lines
An IRIS weekly planning meeting will take place at around 20 UT on Wednesdays. This will allow input to the Hinode weekly meeting which takes place at 01:30 UT on Thursdays.
At line 19 removed one line
Note that between 4 UT and 11 UT on Tuesday coordination seems unnecessary so IRIS should run their own studies.
At line 27 changed one line
Suggestion: IRIS sends provisional plan details for Tuesday and Wednesday to Hinode on Sunday. This feeds into the Hinode draft plan. IRIS then sends final plan details for Tuesday only at 20 UT (Monday) which then lead to pointing and timing changes to the Hinode final plan. IRIS should not make large changes between the provisional plan and final plan.
Suggestion: IRIS sends provisional plan details for Tuesday and Wednesday to Hinode on Sunday. This feeds into the Hinode draft plan. IRIS then sends final plan details for Tuesday at 20 UT (Monday) which then lead to pointing and timing changes to the Hinode final plan. IRIS should not make large changes between the provisional plan and final plan.
At line 47 added 2 lines
__UPDATE__: A procedure for automatically aligning EIS slot images with AIA has been implemented so that the EIS pointing accuracy should now be good to 5" or better (in both X and Y).
At line 48 changed one line
A copy of the IRIS 30 day plan can be obtained by clicking on the 'Attach' tab at the top of this page. This document is accurate as of 17 Jan 2013.
A copy of the IRIS 30 day plan can be obtained by clicking on the 'Attach' tab at the top of this page. %%strike This document is accurate as of 17 Jan 2013/%. This document is out-of-date and will be updated around end-May/early-June. IRIS Technical Note 30, which discusses the 30 day plan, is also provided.
At line 50 changed one line
The 30 day plan generally consists of blocks of several hours with the same pointing. Most of these blocks will be repeated several times during the 30 day period. Within the block IRIS will do several different observation types that last ~ 1 hour (e.g., sit-and-stare followed by rasters). For the convenience of EIS planning, EIS should probably just repeat a single raster for the whole block with slot context rasters appended at the start and end.
The 30 day plan generally consists of blocks of several hours with the same pointing. Most of these blocks will be repeated several times during the 30 day period. Within the block IRIS will do several different observation types that typically last about 1 hour (e.g., sit-and-stare followed by rasters). For the convenience of EIS planning, EIS should probably just repeat a single raster for the whole block with slot context rasters appended at the start and end.
At line 65 added 2 lines
Science goal: evolution of abundances, outflows, and coronal heating.
At line 72 added one line
also abundance study -DB if we're running 7 hours per day
At line 76 added 2 lines
Science goal: sunspot oscillations.
At line 70 changed one line
EIS: tbd.
EIS: assuming that waves are of interest - DRW_Alf_01
At line 88 added 2 lines
Science goal: flows
At line 92 added 2 lines
EIS: DHB_006
At line 96 added 2 lines
Science goal: waves in fan loops (both intensity and Doppler velocity)
At line 84 changed one line
EIS: IUU_SCAN_STEPS_002
EIS: IUU_SCAN_STEPS_002 for intensity oscillations (maybe AIA would do this instead?) or BL_SUMER_EIS
At line 106 added 2 lines
Science goal:on disk, energy transfer (and dynamics) in QS features such as jets and bright points.
At line 92 changed one line
EIS: medium size raster?
EIS: SK_CH1_55X512 a large continuous raster and then HPW002?
At line 116 added 2 lines
Science goal: spicules - looking for coronal counterpart of spicules.
At line 100 changed one line
EIS:
EIS:narrow raster - DRW001_HIGH_BRT_V2 (with density sensitive lines)
At line 126 added 2 lines
Science goal: assuming limb: jet and spicules/plumes
At line 130 added 13 lines
EIS: DRW001_HIGH_BRT_V2 (may need something with bigger step sizes?)
IRIS - possible pointing E-W at limb.
!CH2 - coronal hole properties - 1.5 hours
Science goal: energy transfer in coronal hole - tracking outflow through the atmosphere.
IRIS: deep full wavelength raster.
EIS: quiet raster atlas - DHB_atlas_120M_30"
At line 145 added 2 lines
Science goal:look at absorption across the temperature range, looking at temperature distribution and strong dynamics.
At line 110 changed one line
!PR2 - filament -
EIS: take a full spectrum once. HPW23, then do a sit n stare at limb - PROM_RAST_SMALL_V2
IRIS:
!PR2 - filament - #
Science goal: waves and dynamics in filaments
EIS: sit and stare - BL_SUMER_EIS
IRIS: