This page (revision-20) was last changed on 02-Feb-2017 13:19 by JianSun

This page was created on 25-Jan-2010 12:37 by JianSun

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
20 02-Feb-2017 13:19 102 bytes JianSun to previous
19 25-Jan-2010 14:07 8 KB JianSun to previous | to last
18 25-Jan-2010 14:07 8 KB JianSun to previous | to last
17 25-Jan-2010 12:58 8 KB JianSun to previous | to last
16 25-Jan-2010 12:58 8 KB JianSun to previous | to last
15 25-Jan-2010 12:55 8 KB JianSun to previous | to last
14 25-Jan-2010 12:54 8 KB JianSun to previous | to last
13 25-Jan-2010 12:54 8 KB JianSun to previous | to last
12 25-Jan-2010 12:51 8 KB JianSun to previous | to last
11 25-Jan-2010 12:49 8 KB JianSun to previous | to last
10 25-Jan-2010 12:48 8 KB JianSun to previous | to last
9 25-Jan-2010 12:46 8 KB JianSun to previous | to last
8 25-Jan-2010 12:45 9 KB JianSun to previous | to last
7 25-Jan-2010 12:45 6 KB JianSun to previous | to last
6 25-Jan-2010 12:45 9 KB JianSun to previous | to last
5 25-Jan-2010 12:44 9 KB JianSun to previous | to last
4 25-Jan-2010 12:43 9 KB JianSun to previous | to last
3 25-Jan-2010 12:42 574 bytes JianSun to previous | to last
2 25-Jan-2010 12:40 9 KB JianSun to previous | to last
1 25-Jan-2010 12:37 9 KB JianSun to last

Page References

Incoming links Outgoing links
SytaxTestPage...nobody

Version management

Difference between version and

At line 1 changed 3 lines
[{ALLOW edit EISMainUsers}]
[{ALLOW view Anonymous}]
reference tag is not compatible with PDF plugin
!!!Observing with EIS with the new antenna
[{TableOfContents}]
!!About this page
This Wiki page deals with typical observing constraints that you need to bear in mind when making a proposal for observing with [Hinode EIS|Main].
!!!Practical constraints
!!Time
!OP Periods
An OP Period[1] is the period of time during which an observing programme (''plan'') is defined. e.g. from 10:23 UT on 2008/05/02 to 11:19 UT on 2008/05/04. (The start and end of each OP period are determined by the pattern of ground-station contacts, which varies from day to day.)
Since the transition to stable operations under the S-band antenna, typical OP Period durations have been two or three days.
[1|SytaxTestPage#1]
Once solar activity begins to increase, and solar unpredictability increases accordingly, Hinode may consider more frequent (i.e., one-day-long) OP Periods.
!Post-pointing delay
In order to have co-ordinated observations by its three instruments, Hinode points as a whole satellite (using its AOCS[6]), either tracking a point to compensate for the (differential) rotation of the Sun, or focusing on a fixed point. Either way, changes in pointing by the s/c[7] take time to stabilise. After approximately 90 seconds, Hinode can track or fix on a point with better than 1" accuracy, below the spatial resolution of EIS and XRT.
To avoid observing during the stabilisation of pointing, EIS observations normally start at least two minutes after a satellite re-point.
To see what an Hinode re-pointing schedule looks like, take a look at an example on the Hinode Daily Operations website [here|http://www.isas.jaxa.jp/home/solar/hinode_op/cmdpln/20080626/re-point_200806260100.txt]
!Eclipse Season
Hinode is an Earth-orbiting, sun-facing satellite, and its orbit is Sun-synchronous. However, like other satellites in similar orbits (e.g., TRACE, RHESSI), during eclipse season[5], the line of sight between the spacecraft and the Sun grazes the Earth's atmosphere, causing attenuation (and ultimately complete absorption) of the light that would otherwise be seen by each of the instruments. This attenuation affects first the EUV and X-ray bands, then later the visible wavelength range.
The duration of night-time is calculated for the visible band, and in the peak of eclipse season (around mid-July [3]) this duration is about 20 minutes. EUV absorption (night ingress) begins about 10 minutes before the calculated entry into optical night (listed as NGT_ENTRY) and ends (night egress) in the EUV about 10 minutes after the optical band exit (NGT_EXIT). Thus, the EIS operations team recommend that you leave a __ten-minute buffer around s/c night__ in eclipse season where possible. Extended-duration observations
At the middle of eclipse season, clear EUV day (i.e., not including transition into or out of eclipse) lasts for approximately 60 minutes (not taking into account expansion of the ionosphere with increased solar activity).
For some more information, see my notes on [EclipseEffects].
!South Atlantic Anomaly (SAA)
On most orbits[8], Hinode's orbit intercepts the South Atlantic Anomaly (SAA), a part of the geomagnetic environment where high-energy particles penetrate lower into the magnetosphere. During such passes, significantly more energetic particle hits (''cosmic rays'') are observed on the EIS detector images. These passes are calculated at the same time as other orbital events (such as Eclipse Season NGT events, when appropriate), and times vary each day. Such passes normally last approximately 15 to 20 minutes (although they can be calculated to last for as little as 30 seconds).
Additionally, because the SAA rotates with the Earth — whereas the orbit of Hinode does not — the phase of Hinode's orbit at which each SAA event occurs varies.
However, around 12 UT, Hinode experiences a so-called ''Golden Period'' where the SAA itself does not intercept the s/c orbit. Because the SAA passes vary in time, the start of this period can range (approximately) from 10 to 11 UT, with the end being anywhere from 14 to 16 UT.
The EIS team use a rule of thumb that a __5-minute buffer around SAA ''events'' is sufficient__ to account for the variability in size of the anomaly itself.
''N.B. the old restriction of not changing slit/slot choice during an SAA pass is no longer relevant, following an on-board software update in August 2007''
!Overlap of SAA and Eclipse
There is often a substantial overlap between SAA and NGT events around the orbit. However, the phase of EUV night does not change phase in the orbit (whereas that of the SAA does). Therefore eclipses and SAA passes sometimes coincide (with night being the longer event), and sometimes do not overlap so much. However, there is almost always some overlap. (The exception to this is during the Golden Period, during which there are no SAA periods, but EUV nights continue to occur once per orbit).
As a result, a some parts of the day, the less-than-complete overlap of SAA and night means that the clear window for observing in such orbits can be shorter. Taking into account the buffers (summarised below) around orbital events, the distribution of clear observing windows, calculated from a typical mid-eclipse season OBEV file, ranged from 53 to 68 minutes, with a modal value of 61 minutes.
[{Image src='attach/SbandObservingInfo/Picture%202a.png'}]
!XRT Synoptic Re-pointings
One caveat to the above information on observing windows is that (currently) twice a day, Hinode's X-Ray Telescope (''XRT'') makes a so-called synoptic observation of the Sun. This requires the satellite to point at solar disc centre. However, because XRT is sensitive to particle radiation, and X-ray nights are almost equivalent to EUV nights, it requires these observations to be taken during one of the clear observing windows (above). The duration of XRT's programme (including the time taken to re-point) is 10 minutes. Factoring in the 2 minutes post-pointing delay after the synoptic, this means that observing windows (typically, those closest to or including 06:00 and 18:00 UT) are curtailed by 12 minutes.
!Buffer summary
The table below summarises the time buffers recommended to separate observations from the corresponding events.
|| Event || Buffer
| Re-point | 2 minutes after
| {{{SAA_ENTRY}}} | 5 minutes before
| {{{SAA_EXIT}}} | 5 minutes after
| {{{NGT_ENTRY}}} | 10 minutes before
| {{{NGT_EXIT}}} | 10 minutes after
!!!Volume
!!Typical volume allocation
Since moving to Hinode's S-band antenna for downlinks, EIS typically can downlink something like 600 Mb[2] per 24 hours. This is worked out by the total contact time at all ground-stations, in the coming OP Period, multiplied by the bandwidth to the ground[4]. Typical HOPs should be targeted to something like 250 Mb per day. __However__ , this is a rough guideline only, because the amount of telemetry that it's possible to downlink per day downlinked is quite variable, due to a number of practical factors.
For the most recent daily allocations, you should visit the [Hinode Daily Events|http://www.isas.jaxa.jp/home/solar/hinode_op/hinode_daily_events.php] webpages, where operations are documented, and check the typical allocation for EIS over the last few weeks. (Remember to halve this number to get a rough idea of the volume you should limit yourself to).
!!Do you have examples of what kind of observations are best suited for EIS?
Yes :-)
Go over to the [Study4LowDataVolume] page on this Wiki for examples of programmes recently developed for EIS.
!!!Hinode Operation Plans (HOPs)
This is the typical banner under which joint observations with Hinode are planned. HOPs are recommended by the Science Schedule Co-ordinators for [these types of observations|http://www.isas.jaxa.jp/home/solar/guidance/node5.html].
!!ISAS site guidance
We warmly encourage you to use Hinode in achieving your scientific objectives.
The [ISAS Hinode Operations website|http://www.isas.jaxa.jp/home/solar/hinode_op/] has a link to a new section on [Guidance for Hinode Observations|http://www.isas.jaxa.jp/home/solar/guidance/guidance.html], which is worth reading through in preparation for making a proposal.
!!Why can my old HOP no longer be run?
For background on the switch from X-band to S-band telemetering of data by Hinode, take a look at the [Hinode Science Schedule Co-ordinators' announcement|http://www.isas.jaxa.jp/home/solar/guidance/node1.html], first released in SolarNews.
!!How is the HOP process different?
In short, the answer to this is: not very much :-)
Eighteen months of post-commisioning experience has given the Hinode team time to work out the kind of information and lead time that proposers and team personnel need in order to run observations successfully. So now, this information has been made available as [''Guidance for proposal observations (HOP)''|http://www.isas.jaxa.jp/home/solar/guidance/node2.html] on the ISAS Hinode website.
!!!Extras
!Nomenclature
;__OP__:[#1]''Operation Programme''